Kitchens, Bedrooms, Home Office & Media Walls 2026
Lead times
Current Deelux lead times & delivery schedule
The short answer: most Deelux kitchens run 8–12 weeks from signed order to installed kitchen. Add 3–4 weeks of discovery and design before that if you’re counting from your first showroom visit. In-frame and hand-painted ranges (Falconbrook, Mollingdon) run 10–14 weeks.
Live lead times for new Deelux kitchens, broken down week by week so you know exactly when to book your home survey if you want to be cooking in your new kitchen by a specific date.
Last updated 5 June 2026
At a glance
- Design to installation
- Typically 8–12 weeks from signed order
- First 3D visual
- 5–10 working days from sign-off — included free with every order
- Manufacture in Winsford
- 4–6 weeks from sign-off
- On-site installation
- 1–3 weeks, depending on scope
Week-by-week timeline for a typical Deelux kitchen
The 8–12 week headline number covers manufacture and install only. Add 3–4 weeks of discovery and design on the front end if you’re counting from your first showroom visit.
-
Week 0
Discovery & showroom visit
Book a free appointment at Chester or Warrington. We’ll talk through how you cook, how many people use the kitchen at peak times, your budget range and any architectural constraints. No deposit, no commitment — this is a conversation, not a sales pitch.
-
Week 1
Home survey & laser measurement
A Deelux designer visits your home with a laser measure, captures the room properly (including ceiling slopes, window reveals, soil pipes and existing services) and takes away the brief. This is the survey that catches what a sketch on your phone can’t.
-
Weeks 2–3
Design layout & samples
Your designer works up the layout drawings — cabinetry, worktop, appliances and finishes — and walks you through real door, finish and worktop samples at the showroom. You can compare options side by side and start iterating.
-
Weeks 3–4
Design revisions & final quote
Most kitchens take two to three revision rounds before sign-off. We’ll tweak layout, swap doors, re-spec appliances, move the island, try a different worktop. The final quote is all-inclusive — supply, installation, electrics, plumbing, plastering and decoration.
-
Week 4
Signed order & deposit
Deposit paid, drawings signed, your kitchen is confirmed in your chosen range. From this point the timeline is fixed.
-
Weeks 4–5
Photoreal 3D visuals
Once your order is signed off, your designer produces photoreal 3D visuals — not a 2D plan — showing cabinetry, colour, worktop, lighting and appliances in your actual room. Included free with every Deelux order. You’ll walk through it on screen at the showroom before manufacture begins.
-
Weeks 5–10
Manufacture in Winsford
Andy and the factory team build your cabinets — 18 mm MFC carcasses, Blum soft-close hinges and runners, hand-painted doors if your range is in-frame or Shaker. Every carcass is built by Andy personally. Worktop templating is booked for week 9 or 10.
-
Week 10
Delivery & install begins
Our in-house fitting team removes your old kitchen (disposed of responsibly), first-fixes electrics and plumbing, then begins cabinet installation. You’ll have a temporary kitchen plan agreed before this week.
-
Weeks 10–12
Worktop, appliances, finishing
Worktop templated on installed cabinets (this is why the stone arrives after the cabinets, not before), appliances fitted and tested, plastering, tiling and decoration. Final snag walk with your designer. Keys back.
What can extend the timeline
Our 8–12 week headline assumes standard specification. Any of the following will push the programme out — we’ll flag them at quote stage so there are no surprises.
Bespoke doors or non-stock colours
In-frame ranges (Falconbrook) and hand-painted Shakers (Mollingdon, Maidstone) typically run 10–14 weeks rather than 8–10, because paint cycles and frame assembly take more time in the factory.
Structural work before install
If you’re removing a wall, installing new windows, re-laying a floor or rewiring the room, the install window moves to match your builder’s programme. We coordinate directly with your builder to sequence the work.
Stone worktop availability
Most quartz and granite slabs are in UK stock and template-to-fit in 10–14 days. Specialist slabs (Dekton, Neolith, statement marble) can add 2–4 weeks depending on quarry and finish.
Premium appliance lead times
Miele, Sub-Zero, Wolf, Gaggenau and La Cornue appliances sometimes run 8–12 weeks on their own. We’ll flag this at quote stage and can build around it where possible.
Busy seasons
October–December and May–July are our busiest install windows. Sign-offs in August or January typically get the earliest install slots; Christmas-in-the-new-kitchen customers should sign off by early September.